top of page

Crowhill Fish Screens

This project involved the replacement of a fish screen system at Crowhill Water Treatment Works for Welsh Water. The outline design was produced by a third party. BIMTek were responsible for producing a 3d coordination model and layout drawings for the main contractor.

​

The 3d model proved to be incredibly useful as this project had a number of stakeholders with design input. It allowed for changes to incorporated effectively as the design evolved. 

bottom of page