East Quay SPS
BIMTek worked on all phases of the Poole, East Quay PS refit for Wessex Water.
​
Outline > Detail > Fabrication > Construction Support > As Built Capture
​
BIMTek scanned the existing site and produced a 3D model in Autodesk Revit. This model was then updated as the design progressed and then used to produce construction drawings.
​
They key aspects of the project included:
​​
-
replacement of 3 no. shaft driven pumps;
-
removing part of building for improved ventilation and access of the wet well;
-
new MCC;
-
redesigning the front of the building to improve appearance, access, parking and access to the generator.
​
Precision fabrication drawings were produced for pipework allowing it to be manufactured off site. This significantly reduced the total time required for installation to 4 days from an estimated 3 weeks.
![20180727_090047](https://static.wixstatic.com/media/55d56d_3c333e6c048545669c7546987059607e~mv2_d_2560_1440_s_2.jpg/v1/fill/w_980,h_551,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/55d56d_3c333e6c048545669c7546987059607e~mv2_d_2560_1440_s_2.jpg)
![20180727_090212](https://static.wixstatic.com/media/55d56d_c7c47c8499fc4275b1197aac183ade72~mv2_d_2560_1440_s_2.jpg/v1/fill/w_980,h_551,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/55d56d_c7c47c8499fc4275b1197aac183ade72~mv2_d_2560_1440_s_2.jpg)
![20180727_090607](https://static.wixstatic.com/media/55d56d_f0bd66ed664949eda4e726dc2030201a~mv2_d_1440_2560_s_2.jpg/v1/fill/w_980,h_1742,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/55d56d_f0bd66ed664949eda4e726dc2030201a~mv2_d_1440_2560_s_2.jpg)
![20180727_090047](https://static.wixstatic.com/media/55d56d_3c333e6c048545669c7546987059607e~mv2_d_2560_1440_s_2.jpg/v1/fill/w_980,h_551,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/55d56d_3c333e6c048545669c7546987059607e~mv2_d_2560_1440_s_2.jpg)