East Quay SPS
BIMTek worked on all phases of the Poole, East Quay PS refit for Wessex Water.
​
Outline > Detail > Fabrication > Construction Support > As Built Capture
​
BIMTek scanned the existing site and produced a 3D model in Autodesk Revit. This model was then updated as the design progressed and then used to produce construction drawings.
​
They key aspects of the project included:
​​
-
replacement of 3 no. shaft driven pumps;
-
removing part of building for improved ventilation and access of the wet well;
-
new MCC;
-
redesigning the front of the building to improve appearance, access, parking and access to the generator.
​
Precision fabrication drawings were produced for pipework allowing it to be manufactured off site. This significantly reduced the total time required for installation to 4 days from an estimated 3 weeks.